The next trade knows the moment it’s their turn.
When one trade’s work is photographed and approved, the next trade gets told they’re up. Inspections wait until everything before them is verified.
No credit card. Subcontractors are always free. En inglés y en español.
What everyone on the job sees
Lot 14, Smith residence, right now:
Everyone on the job sees the same line: who’s done, who’s up, and who’s waiting on whom.
How a job runs
Lay out the sequence
Start from a residential or commercial template and choose which trades wait on which.
Subs hear when they’re up
The moment the work before theirs is approved, they get an email in English or Spanish and confirm a start date.
Proof instead of phone calls
Each checklist item needs a photo taken on site, stamped with the time and GPS location.
Approve from the truck
Accept the work or send it back with notes. Accepting tells the next trades they can start.
Inspections in the line-up
The inspector gets a link with every photo of the work being covered, no login needed.
Sign off once
Do your final walk, sign, and keep a printable record of everything behind the drywall.
General contractors
Fewer drives to the site to check. No trade shows up before the work ahead of them passes.
Subcontractors, free
One login for every GC you work for, with your whole schedule in one place. Every screen works in English or Spanish.
Inspectors
Every photo for the inspection, sorted by trade, before you pull up.
Free for 30 days, unlimited projects.
After that, one active project stays free for good. Your subs never pay.